Back Fill and Concrete Cutting

 Today was a big day for our project. The concrete basement walls have cured and we were able to push the dirt back in around them. The basement window wells are in. Our garage floor was demolished and hauled away. The existing walls from our basement were also removed and hauled away. A temporary wall has been built. It is nice to have the dirt pile smaller.


The giant tractor is back!

Garage floor this morning.

Garage floor after the concrete demo.

Basement walls torn down and removed.